healthcare

Sterile Processing Department Renovation

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to make improvements to ensure the space temperature, humidity and pressurization relationships are in compliance with designed referenced guidelines. In addition, the project required the sealing of the existing ductwork, perimeter walls and installation of new…

USP 800 Compliance Pharmacies Upgrades

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead and manage the effort to make improvements and upgrades to the multiple campus pharmacy departments, drug compounding areas, and sterile work areas making them comply with USP 800 compliance.

The project was a multi-phased effort that included multiple meetings with…

Perioperative Air Handling Unit Replacement

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to replace the existing air handling units that serves 8 of the 15 Operating Rooms in the OR Suite. The new air handling units included a variable frequency drive controlled fan array and an upgrade to…

Magnetic Resonance Imaging (MRI) Replacement

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to manage the replacement of the MRI machine in the Moffitt Cancer Center main hospital. We were tasked with overseeing the design and construction portion of the project where the Siemens 3T MRI had to be lifted…

Generator Fuel Systems Upgrades

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort and manage the installation of an 8,000 gallon above ground double wall diesel fuel tank at the Moffitt Research Center, and a 12,000 gallon above ground double wall diesel fuel tank at the McKinley Center. Both systems…

Fluoroscopy Equipment Replacement

Moffitt Cancer Center
Tampa, Florida

As the Owner’s Representative, KTECH Project Services lead the team on the phasing of the replacement of the existing equipment, as well as the management of the project. This included the placement of barriers, movement and flow of staff and patients, and infection control requirements….

Patient Tower Air Handling Unit Replacement

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to replace the existing air handling units that served patient floors Level 4 South and Level 5 South of the hospital. Two new air handling units were installed for each floor and were equipped with supply fan…

Fred and Pamela Buffett Cancer Center

Nebraska Medicine
Omaha, Nebraska

KTECH Project Services role started at the conceptual stage and has continued throughout the project. Our oversight of the infrastructure systems and compliance with the organization’s regulatory requirements and standards was instrumental throughout the design process. Ensuring that the professional design services stayed on track were vital…

CHI Health Clinic

New Health Clinic
CHI Health
La Vista, Nebraska

KTECH provided value through our expertise in the specific understanding of the environment and nuances for proper interaction and communication with the clinical team. Work processes for the medical team and business professionals have been redesigned to occur behind-the-scenes.In addition, KTECH helped create a…