project management

Sterile Processing Department Renovation

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to make improvements to ensure the space temperature, humidity and pressurization relationships are in compliance with designed referenced guidelines. In addition, the project required the sealing of the existing ductwork, perimeter walls and installation of new…

USP 800 Compliance Pharmacies Upgrades

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead and manage the effort to make improvements and upgrades to the multiple campus pharmacy departments, drug compounding areas, and sterile work areas making them comply with USP 800 compliance.

The project was a multi-phased effort that included multiple meetings with…

Perioperative Air Handling Unit Replacement

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to replace the existing air handling units that serves 8 of the 15 Operating Rooms in the OR Suite. The new air handling units included a variable frequency drive controlled fan array and an upgrade to…

Magnetic Resonance Imaging (MRI) Replacement

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to manage the replacement of the MRI machine in the Moffitt Cancer Center main hospital. We were tasked with overseeing the design and construction portion of the project where the Siemens 3T MRI had to be lifted…

Generator Fuel Systems Upgrades

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort and manage the installation of an 8,000 gallon above ground double wall diesel fuel tank at the Moffitt Research Center, and a 12,000 gallon above ground double wall diesel fuel tank at the McKinley Center. Both systems…

Fluoroscopy Equipment Replacement

Moffitt Cancer Center
Tampa, Florida

As the Owner’s Representative, KTECH Project Services lead the team on the phasing of the replacement of the existing equipment, as well as the management of the project. This included the placement of barriers, movement and flow of staff and patients, and infection control requirements….

Patient Tower Air Handling Unit Replacement

Moffitt Cancer Center
Tampa, Florida

KTECH Project Services was contracted to lead the effort to replace the existing air handling units that served patient floors Level 4 South and Level 5 South of the hospital. Two new air handling units were installed for each floor and were equipped with supply fan…

CMS Infrastructure Systems Modifications

Centers for Medicine & Medicaid Services (CMS) Capital Improvement Projects
University of Nebraska Medical Center and Nebraska Medicine
Omaha, Nebraska

KTECH was originally hired to manage the CMS University Tower Electrical Upgrades Project in 2009. KTECH’s scope of work evolved to include the Campus Fire Alarm Upgrades and Campus Barrier Management Project….

University Tower Electrical System Upgrade

University Tower Electrical System Upgrade
Nebraska Medicine
Omaha, Nebraska

The electrical distribution system was completely modified beginning at the Central Utility Plant all the way to the branch distribution on each floor. KTECH led the communication and coordination efforts, which was extremely important during the course of the project. KTECH created value…